Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Ameristar Home Additions & ADU: The Miami Owner’s Guide
Ameristar home additions and ADU construction in Miami typically runs $53,100 – $153,400 installed, and we handle the entire permitting and build process from slab to finish. Most owners call us when an existing addition or accessory dwelling unit starts showing structural stress from Miami’s specific conditions: humidity-driven wood rot, window leaks from afternoon downpours, or concrete settling in sandy soil. If you have an Ameristar-built addition or ADU that’s failing, we stock the framing, waterproofing, and finish materials to match what’s already there, usually within the same week you call.
What we see most in Miami: the original Ameristar framing held up, but the exterior envelope didn’t. Flashing fails first, then water gets into the sheathing, and within two or three wet seasons you’re looking at rotted studs and mold behind the drywall. The part that failed is rarely the framing, it’s the waterproofing system around it.
Which Ameristar Models This Applies To

Ameristar’s home addition and ADU product lines include modular room extensions, attached garage conversions, and standalone accessory dwelling units, most built on either a slab-on-grade or raised pier foundation. The compatibility gotcha we run into constantly: Ameristar’s older Miami-area ADUs (pre-2015) used 2×4 exterior walls, while current code for conditioned living space in Miami-Dade requires 2×6 or insulated concrete form construction. If you’re extending an older Ameristar structure, you can’t just sister new 2x4s onto it and call it done, it won’t pass inspection.
The second spec to check before ordering any replacement material is wall thickness. Ameristar’s current ADU panels run 4.5 inches for interior partition walls and 6.5 inches for load-bearing exterior walls. We measure every wall we’re matching before writing the quote, because the difference between a $53,100 addition and a $153,400 one often comes down to structural upgrades the original build never had.
On the OEM-versus-aftermarket question for Ameristar: most of the individual components (sheathing, fasteners, flashing, windows, doors) came from standard building suppliers in the first place. The Ameristar name matters more for the shell design and the truss engineering than for the finish parts. We use manufacturer-backed materials from KraftMaid, Cambria, and Silestone for the interior, and we match framing lumber and sheathing to the original Ameristar spec unless the original is under code, in which case we upgrade and tell you exactly why in the written quote.
Styles & brands we work with







Signs Your Ameristar Home Additions & ADU Is Failing
- Water staining at ceiling-wall joints after a hard rain. This is almost always failed flashing or a cracked sealant joint where the addition ties into the original roofline. Miami’s afternoon thunderstorms hit at a steep angle, and the joint between old roof and new roof is the first place water finds a way in.
- Doors or windows that stick in the summer. Sandy soil plus seasonal ground saturation means the slab or piers move slightly. A door that binds in August wasn’t always like that; it’s a sign the foundation has shifted enough to rack the opening.
- Soft or bubbling drywall near the baseboards. That’s moisture wicking up from the slab or in from a failed weep screed. By the time you see it, the drywall is gone and the bottom plate behind it is usually compromised too.
- Visible cracks running diagonally from window corners. Diagonal cracking means shear stress, not normal settling. On an Ameristar addition, this is often the wall sheathing taking load the framing was never sized for.
- Mold odor that comes back after cleaning. If the addition smells like an old boat in August, the moisture source is still active behind the finish. Cleaning the surface doesn’t fix the envelope leak feeding it.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For a Miami home addition or ADU on an Ameristar structure, plan on $53,100 – $153,400 installed. The spread comes down to these factors: whether the original slab or pier foundation can be reused ($8,000 – $15,000 saved if it’s sound), how much of the existing framing needs to come out, whether the roof tie-in requires a full re-sheet or just a patch, and the finish level you want on the interior.
Here’s how the price breaks down on a typical Ameristar addition repair or rebuild in Miami:
- Foundation assessment and repair: $3,500 – $12,000
- Structural framing replacement or sistering: $8,000 – $28,000
- Exterior envelope (flashing, sheathing, waterproofing): $6,000 – $22,000
- Roof tie-in and re-sheeting: $5,000 – $18,000
- Finish work (drywall, flooring, trim, paint): $15,000 – $45,000
- Permits and inspections: $4,000 – $11,000
Every quote from Sawyer Remodel Miami is a written line-item price before any work starts. The number on the invoice is the number you approved. That’s The Relay Standard, and it applies to every job we take in Miami, no exceptions. And every project is covered by our 365-Day Done Right Promise: if it’s not done right, we make it right, in writing.
DIY or Call Us?
You can safely check a few things yourself: look for visible flashing separation at the roofline, run a hose along the exterior walls on a dry day to spot where water is getting in, and mark any cracks with painters tape to see if they’re still moving. Those are diagnosis steps a homeowner can do with zero risk.
What you shouldn’t do is remove drywall to look for rot, cut into load-bearing framing, or try to patch a structural crack with caulk and hope. Miami’s wind load requirements are serious, and an addition that’s already compromised can fail further once you open it up without temporary bracing. That’s how a $6,000 repair becomes a $50,000 rebuild. If the problem is structural, call us at (850) 801-8046 and we’ll tell you straight whether it’s a patch job or a tear-out before you spend a dime.
FAQs

A properly built Ameristar addition or ADU with a maintained exterior envelope should last 40 – 60 years in Miami’s climate, but the waterproofing components (flashing, sealants, window gaskets) typically need replacement every 8 – 12 years. The framing can last decades if water never reaches it, but Miami’s humidity and salt air will find any breach in the envelope long before the lumber itself gives out. If your addition is over 15 years old and hasn’t had its flashing and sealants inspected, call (850) 801-8046 and we’ll come look before a small leak becomes a structural job.
Most Ameristar additions and ADUs with structural issues can be repaired, not fully rebuilt, as long as the foundation is sound and the damage is caught before mold reaches the studs. What typically gets replaced is the failed envelope (flashing, sheathing, waterproofing), the compromised framing members, and the finish layers that have absorbed moisture. The call comes down to what we find when we open the wall, and that’s why our written quote includes a contingency line that you approve before we proceed.
Most structural repairs and envelope replacements on Ameristar additions run 3 – 6 weeks depending on scope, while a full rebuild or new ADU build runs 8 – 16 weeks including permitting. Miami-Dade and city permitting timelines vary by municipality, and we handle every permit and inspection as part of the job. You’ll get a written timeline before work starts, and photo updates before and after each phase so you can see exactly where your project stands.
We maintain stock on the Ameristar-compatible framing lumber, sheathing, flashing, and fasteners most commonly needed for Miami repair jobs, plus finish materials from KraftMaid, Cambria, and Silestone when you’re using the repair as a chance to upgrade. Anything outside standard inventory is ordered direct from our suppliers with about a 3 – 5 business day lead time in Miami. Either way, we source every material before we start so you’re not living with open walls longer than necessary.
If your Ameristar addition or ADU is showing signs of failure, don’t wait until the next storm season. Call Sawyer Remodel Miami at (850) 801-8046 for a free estimate. Luca Romano and our crew will tell you exactly what’s wrong, what it costs, and how long it takes, all in writing before you commit. Good work doesn’t need a sales pitch.
Written by Luca Romano, Owner & Lead Contractor, Sawyer Remodel Miami at Sawyer Remodel Miami, serving Miami and nearby areas.